Large Driveway & Carpark Resurfacing, Wyong
A long entry laneway and rear parking area near Wyong rebuilt from bare ground up, with conduit and roadbase in before the asphalt.
30+ years of civil construction on the Central Coast, and major projects north and south of it. Every project delivered by our own crew, with our own plant, to the highest standard.
A small sample of recent work. Most of our jobs are under someone's car by lunchtime, so we do not always stop for photos. Drive past any of these and have a look.
A long entry laneway and rear parking area near Wyong rebuilt from bare ground up, with conduit and roadbase in before the asphalt.
A commercial carpark at Terrigal milled and repaved cell by cell, with the bay lines reinstated at the end.
New kerb and channel at Morisset with a matching asphalt shoulder strip laid and sealed against it along the block.
A winding access path across open grounds at Mangrove Mountain re-graded and paved in a single run.
A steep tree-lined access drive at Lisarow resurfaced from the roadside gate up to the forecourt at the house.
Several hundred metres of private access track at Wyee, primed and sealed from the gate through to the sheds.
A shared rural lane at Empire Bay regraded and resurfaced in sections, with aprons run in at each house along it.
An access chamber in the road at Kincumber reinstated, from the square cut through to the torched joint.
We built and sealed a new road through a bushland subdivision, from the paver laying the mat to the finished road sweeping through the estate.
We resurfaced a full-width road at night under lights, keeping traffic moving by day and reopening the road by morning.
We resurfaced a commercial car park and its access road, laying fresh hot-mix asphalt through to a clean, even finish.
We built a paved driving test track, from earthworks and base preparation through to the asphalt surface.
We built a new car park at Biraban Public School out of school hours, from excavation and base preparation through to the finished asphalt surface.
Excavation and base preparation for a new basketball court at Warners Bay Public School.
We built a car park at an industrial estate, from stripping the old surface and preparing the base through to laying and compacting the new asphalt.
Excavation and reinstatement of a failed council road section ahead of new hot mix asphalt.
Road base placed and compacted across a new subdivision ahead of sealing.
Heavy patch repair on a rural council road, excavated, relaid and rolled to a durable finish.
Our crew carried out night road patching at Terrigal, working out of hours to keep traffic moving through the day.
We prepared and asphalted a large residential driveway, from base preparation through to a smooth finished surface.
We resurfaced the shared driveway of a residential strata complex, rolling fresh hot-mix asphalt and hand-finishing edges against garden beds and garage aprons.
We built a new rural driveway from the road to the property, compacted and sealed by our own crew.
We resurfaced the asphalt pump track at Umina, laying a fresh, smooth surface over its rolling humps and berms.
We laid asphalt driveways at homes across the Central Coast, each finished with a smooth, sealed black surface and clean edges.
Hot mix asphalt delivered and placed on site by our crew, ready for compaction.
Road shoulder sealing with bitumen tape to bind the new edge to the existing pavement.
Road shoulder excavation to widen and rebuild the pavement edge.
A clean asphalt connection joining a residential driveway to the road.
Localised road patch repair, sealed and rolled flush with the surrounding surface.
A raised pedestrian threshold built at Kanwal Public School to calm traffic at the crossing.
A new concrete footpath laid through a school precinct.
Sandstone sub base spread and levelled to grade across a subdivision site.
Night heavy patch repair on a council road, completed out of hours to reduce disruption.

Council heavy patch on a suburban street, compacted with dual rollers for a tight, even surface.

Full resurfacing of a worn driveway in a unit complex. All preparation and laying completed in a single day. Residents drove on it that evening.

Asphalt parking area on the nature strip. Properly prepared base, compacted AC10 wearing course, clean finished edges.

Road patching across multiple council sites. Hot-mix asphalt repairs to the Central Coast road network, completed on schedule.

Approximately 200m2 road-to-garage asphalt driveway. Smooth AC10 wearing course. Finished on time and within budget.

Driveway crossover from road to boundary where no kerb and gutter exists. Flexible asphalt solution shaped to site requirements.

A cracked laneway in Wyong taken back to base and reinstated, from hazard tape up to finished patch.
A single-lane driveway at Wamberal resurfaced from the road up to the house, with eucalypt hard against both edges.
Failed sections of a Lisarow car park repaired one at a time, with the surrounding surface left as it was.
Glenn and his team were terrific. Such a difficult job made to look easy.
Garry Parnell
Free site visit. Prompt written quote.